LOUNGE
Full installations, single aspects, finishing touches.
-
Button
Installation of some new alcove storage in this lounge, featuring drawers, shaker style doors & heavy duty shelving within.
-
Button
Some blown double glazed units were replaced here, there was no need to replace the frames.
-
Button
The existing window in this stone cottage was wasting the view.
By opening the wall up this room became a showstopper.
-
Button
A knockthrough to link the lounge with the soon to be study/spare room. The hole was made, the lintels were fitted and the step between the two floor levels was prepped.
-
Button
The new door was installed. Ready for the wall to be plastered & painted.
-
Button
This lounge was lacking in natural light. Two new window openings were marked ready to be opened, making allowances for the chimney breast on the external side of the wall.
-
Button
The windows and lintels were fitted and the plasterboard patched, ready to plaster.
-
Button
A new meter cupboard was built and painted, along with new skirting throughout.
-
Button
Rotten timber work needed replacing following the completion of a damp course.
-
Button
The new fire surround was made & installed, the picture rail fitted. Just the skirting outstanding.
-
Button
The external chimney breast was removed and the wall was cut out to make the new window opening.
-
Button
The wall was built back up to the required level and a lintel fitted, ready for the window and render before moving inside.